A charging station with IP55 and IK10 ratings can withstand rain and impacts. But it still needs to be installed correctly. Here are the five points our technical support team most often reminds installers about. The first shipments will be dispatched within ten working days.
- Mount it at the right height. Position the socket between 0.90 m and 1.30 m above the finished floor. This keeps it accessible to everyone and out of reach of splashes.
- Route cables in from below. A top entry will eventually let water in, even with a tightly secured cable gland.
- Protect the charging station from vehicle bumpers. In a car park, a protective barrier or wheel stop costs less than replacing an enclosure.
- Avoid direct sunlight. Above 50 °C inside the enclosure, the charging station reduces its power output to protect itself. A north-facing wall or a small canopy is enough.
- Label the circuit at the distribution board. The “Electric vehicle charging” label supplied with our Tutélis enclosures saves a lot of searching when troubleshooting.
What about a pedestal?
When no wall is available, a Stabéo Solo pedestal secured to a Stabéo Béton foundation provides a neat installation in half a day, without waiting for concrete poured on site to dry.